“For The very first time within the state a 720 kV significant stress power line was shifted for the construction of the road, and it took loads of effort and coordination with the two the Haryana and Delhi governments for getting these difficulties resolved. It is anticipated to cross the https://seo-a1directory.com/listings280667/the-single-best-strategy-to-use-for-what-is-the-future-of-dwarka-expressway